Posted by [IP Address: 61.179.14.250] 'Dan' on September 19, 2001 at 10:32:10 EST:
Hi guys:
After I enter a material in a sales order, I noticed that, on the Procurement tab, the field Requirement Type is sometimes grayed out. Sometimes it is not, and I could change the requirement type. Does anyone know what is the setting that control this?
Thanks,
Dan