Logistics: PP Module
Search on Keyword(s):
[
Post Message
]
Open Order Res
-
Data Maint. Man
12:06:31 9/21/01 EST
(0)
Reverse Backflush without Reversal document-REM 4.5B
-
Azy
10:24:42 9/21/01 EST
(0)
Blocking Goods receipt for a Production Order if no components are issued or no operation
-
Rav
10:21:57 9/21/01 EST
(1)
Re: Blocking Goods receipt for a Production Order if no components are issued or no operation
-
Ed
11:43:36 9/21/01 EST
(0)
Blocking Goods receipt for a Production Order if no components are issued or no operation
-
Rav
10:21:43 9/21/01 EST
(0)
Blocking Goods receipt for a Production Order if no components are issued or no operation
-
Rav
10:19:40 9/21/01 EST
(0)
Rate Routing - Urgent !
-
PP NEwComer
02:27:41 9/21/01 EST
(0)
Alternate Calendar in Work Center
-
Butch Godin
16:29:54 9/20/01 EST
(0)
I cannot technically complete an Production Order-URGENT!!!!!
-
Azy
11:59:22 9/20/01 EST
(3)
Re: I cannot technically complete an Production Order-URGENT!!!!!
-
RK
13:55:10 9/20/01 EST
(1)
Re: I cannot technically complete an Production Order-URGENT!!!!!
-
Azy
17:27:42 9/20/01 EST
(0)
Re: I cannot technically complete an Production Order-URGENT!!!!!
-
RK
13:52:43 9/20/01 EST
(0)
Calculate cost standard material no get % of formules PP
-
Leonel Saavedra
11:44:46 9/20/01 EST
(0)
Changed in Production Order
-
Paul
09:58:50 9/20/01 EST
(0)
Text in Confirmation
-
PP
08:42:18 9/20/01 EST
(1)
Re: Text in Confirmation
-
RK
14:15:29 9/20/01 EST
(0)
Text in Confirmation
-
PP
08:41:37 9/20/01 EST
(0)
CO24, shortage of zero reported
-
Jim Sharrock
07:50:50 9/20/01 EST
(0)
Capacity Utilization
-
Ram
03:30:53 9/20/01 EST
(1)
Re: Capacity Utilization
-
RK
14:33:50 9/20/01 EST
(0)
Forecasting based on planned consumption
-
jeff m.
00:36:21 9/20/01 EST
(0)
PRTS Assigning - Urgent
-
GV
23:39:09 9/19/01 EST
(1)
Re: PRTS Assigning - Urgent
-
tony m
11:47:15 9/20/01 EST
(0)
Cellular Manufacturing
-
tony m
12:15:57 9/19/01 EST
(0)
Capacity Planning Table
-
Ram
11:24:21 9/19/01 EST
(0)
Capacity Levelling - URGENT!!!!
-
Ram
11:22:38 9/19/01 EST
(3)
Re: Capacity Levelling - URGENT!!!!
-
Hans Bjelke
07:34:07 9/20/01 EST
(2)
- Thanks Hans..But
-
Ram
23:55:07 9/20/01 EST
(1)
Shop Floor Info System ?
-
Hans
07:59:05 9/21/01 EST
(0)
scheduling...urgent
-
Anne Mmehta
05:16:17 9/19/01 EST
(3)
Check OPU3
-
GIlbert
05:36:54 9/19/01 EST
(2)
Re: Check OPU3
-
Anne
07:01:02 9/19/01 EST
(1)
Check Master Data
-
GIlbert
07:56:14 9/19/01 EST
(0)
User exit at creation/release of production order
-
Edy
13:30:52 9/18/01 EST
(2)
Re: User exit at creation/release of production order
-
Adrien
11:47:16 9/19/01 EST
(0)
Re: User exit at creation/release of production order
-
Stone Picker
00:02:14 9/19/01 EST
(0)
Procurement Report
-
Lax
13:04:35 9/18/01 EST
(1)
Re: Procurement Report
-
Stone Picker
00:08:38 9/19/01 EST
(0)
WM staging for Prod. Orders
-
Don
10:27:25 9/18/01 EST
(1)
Use OMKX
-
GIlbert
05:33:06 9/19/01 EST
(0)
Confirmation Slips for Production Orders
-
Don
10:24:50 9/18/01 EST
(0)
Delivery Cycle
-
sp
04:53:36 9/18/01 EST
(0)
planning calender
-
sp
03:23:53 9/18/01 EST
(2)
Re: planning calender
-
Steve
03:43:14 9/18/01 EST
(1)
Re: planning calender
-
sp
04:41:23 9/18/01 EST
(0)
pp order status
-
knowles
02:43:22 9/18/01 EST
(0)
Delete material from Info Structure S076
-
Mike
17:33:18 9/17/01 EST
(1)
Re: Delete material from Info Structure S076
-
Leonel
12:18:47 9/20/01 EST
(0)
Fixing a BOM component quantity in REM Backflushing
-
Zeeshan
14:45:58 9/17/01 EST
(1)
Re: Fixing a BOM component quantity in REM Backflushing
-
sak
07:48:17 9/19/01 EST
(0)
REM activity backflush
-
FM
10:02:37 9/17/01 EST
(0)
mrp type
-
sp
08:52:16 9/17/01 EST
(0)
Block assm order
-
knowles
05:59:52 9/17/01 EST
(1)
Re: Block assm order
-
peter
00:49:40 9/18/01 EST
(0)
Safety Stock and its procedure
-
ppk
00:54:21 9/17/01 EST
(1)
Re: Safety Stock and its procedure
-
Steve
06:58:21 9/17/01 EST
(0)
cowbpack external number
-
ththibault duval
12:45:58 9/16/01 EST
(0)
Looking for Repetitive Manufacturing Site
-
Butch Godin
07:44:00 9/16/01 EST
(0)
MRP
-
Reddy
02:47:48 9/16/01 EST
(0)
Ranage of coverage
-
Ramesh
02:44:35 9/16/01 EST
(1)
Re: Ranage of coverage
-
Martin Traub
14:08:08 9/17/01 EST
(0)
MRP
-
ST_LO
08:35:19 9/15/01 EST
(0)
MRP
-
ST_LO
08:34:03 9/15/01 EST
(0)
FINAL BACKFLUSH wihtout BOM - URGENT - Please help
-
xx
04:23:56 9/15/01 EST
(0)
MRP - Discontuniation material
-
adam
02:28:59 9/15/01 EST
(0)
MRP
-
MM
01:56:27 9/15/01 EST
(0)
Dependent requirements
-
Purush
07:29:18 9/14/01 EST
(4)
Re: Dependent requirements
-
GIlbert
08:56:00 9/14/01 EST
(3)
Re: Dependent requirements
-
Reddy
04:48:16 9/15/01 EST
(1)
Reddy, check my posting below
-
Hans Bjelke
13:19:33 9/17/01 EST
(0)
Re: Dependent requirements
-
Bondan
00:48:03 9/15/01 EST
(0)
Range of coverage
-
Ramesh
06:59:08 9/14/01 EST
(3)
Re: Range of coverage
-
GIlbert
08:51:51 9/14/01 EST
(2)
Re: Range of coverage
-
Ramesh
04:31:53 9/15/01 EST
(1)
Re: Range of coverage
-
Ramesh
04:34:41 9/15/01 EST
(0)
MRP
-
Reddy
06:50:32 9/14/01 EST
(3)
Re: MRP
-
Bondan
00:27:44 9/15/01 EST
(1)
Re: MRP
-
Reddy
05:06:20 9/15/01 EST
(0)
Re: MRP
-
GIlbert
08:46:50 9/14/01 EST
(0)
MRP Area: Bug???
-
PP MRP Area
05:38:51 9/14/01 EST
(0)
URGENT ...No instance exists for planned order
-
GP
00:09:54 9/14/01 EST
(1)
Re: URGENT ...No instance exists for planned order
-
Hans Bjelke
13:17:07 9/17/01 EST
(0)
Retail : Vendor delivery dates vs MRP/RP
-
Twee Seng
21:36:59 9/13/01 EST
(0)
Capacity Evaluation & Leveling: Overall Profiles
-
MZ
19:38:15 9/13/01 EST
(2)
Re: Capacity Evaluation & Leveling: Overall Profiles
-
GIlbert
08:43:26 9/14/01 EST
(1)
Re: Capacity Evaluation & Leveling: Overall Profiles
-
Nancy
06:57:33 9/18/01 EST
(0)
Usage of POSTING PERIODS in MRP cross-plant evaluation
-
Ana M
18:09:56 9/13/01 EST
(0)
BATCH CREATION
-
MARK RUCKER
15:31:34 9/13/01 EST
(1)
Re: BATCH CREATION
-
GIlbert
08:37:38 9/14/01 EST
(0)
Need help urgent-table for Production order operation?
-
Jony
11:46:38 9/13/01 EST
(2)
Use SAP standard Solution instead of ABAP
-
GIlbert
08:32:45 9/14/01 EST
(0)
Re: Need help urgent-table for Production order operation?
-
Joe
15:12:59 9/13/01 EST
(0)
control for confirmation
-
kris
07:39:05 9/13/01 EST
(1)
Re: control for confirmation
-
Rich.
10:16:17 9/17/01 EST
(0)
Blocking creation of alternative BOM
-
Memin
07:03:13 9/13/01 EST
(2)
Re: Blocking creation of alternative BOM
-
gilbert
08:32:35 9/13/01 EST
(0)
Re: Blocking creation of alternative BOM
-
VENKAT
08:26:51 9/13/01 EST
(0)
Pull list option
-
Steve
05:42:25 9/13/01 EST
(1)
Re: Set global parameters to "unit of issue"
-
william
01:43:03 9/20/01 EST
(0)
About Order BOM
-
Grace Jin
04:40:49 9/13/01 EST
(0)
MDTB table
-
pp guy
00:43:34 9/13/01 EST
(2)
Re: MDTB table
-
noach
08:15:29 9/13/01 EST
(1)
Re: MDTB table
-
ppguy
00:11:20 9/14/01 EST
(0)
MDTB table
-
ppguy
23:52:01 9/12/01 EST
(0)
planning strategy
-
alex
10:33:06 9/12/01 EST
(1)
Re: planning strategy
-
Gilbert
03:55:52 9/13/01 EST
(0)
planning strategy
-
alex
10:32:19 9/12/01 EST
(1)
Re: planning strategy
-
tony m
15:21:04 9/14/01 EST
(0)
Routing: standard labor rate
-
jim
09:44:58 9/12/01 EST
(1)
Re: Routing: standard labor rate
-
Jim
11:28:07 9/12/01 EST
(0)
Capacity Evaluation for Multiple Indiv Capacities
-
Ram
01:11:59 9/12/01 EST
(1)
Re: Capacity Evaluation for Multiple Indiv Capacities
-
Nancy
21:49:15 9/17/01 EST
(0)
MRP List fpr multi plant
-
Bearlaker
00:00:59 9/12/01 EST
(1)
Re: MRP List fpr multi plant
-
Mario
06:03:14 9/12/01 EST
(0)
: Labor cost not updated during production order confirmation
-
Manoj
22:41:52 9/11/01 EST
(0)
One raw material produce more than one finished goods
-
Bondan
21:50:03 9/11/01 EST
(1)
Re: One raw material produce more than one finished goods
-
Mario
06:06:17 9/12/01 EST
(0)
PP / WM
-
henry
08:53:04 9/11/01 EST
(0)
Related tables between Production Order
-
hen
04:47:01 9/11/01 EST
(8)
Re: Related tables between Production Order
-
G.H
07:34:45 9/11/01 EST
(1)
Explaination of my Question
-
hen
03:21:02 9/12/01 EST
(0)
Re: Related tables between Production Order
-
R Srinivasan
07:22:24 9/11/01 EST
(0)
Re: Related tables between Production Order
-
hen
05:37:52 9/11/01 EST
(3)
Re: Related tables between Production Order
-
noach
08:21:48 9/13/01 EST
(2)
Re: Related tables between Production Order
-
hen
21:32:05 9/13/01 EST
(1)
Re: Related tables between Production Order
-
noach
04:03:34 9/14/01 EST
(0)
Re: Related tables between Production Order
-
noach
04:56:02 9/11/01 EST
(0)
capacity planning
-
vishraam
04:24:29 9/11/01 EST
(1)
Re: capacity planning
-
Hans Bjelke
08:23:40 9/12/01 EST
(0)
Upload of Forecast from Excel Sheet as PIR
-
Don
18:45:42 9/10/01 EST
(4)
Re: Upload of Forecast from Excel Sheet as PIR
-
Martin
07:37:54 9/12/01 EST
(3)
Re: Upload of Forecast from Excel Sheet as PIR
-
Bram
07:57:21 9/12/01 EST
(2)
Re: Upload of Forecast from Excel Sheet as PIR
-
Martin
04:42:13 9/14/01 EST
(0)
Re: Upload of Forecast from Excel Sheet as PIR
-
Don
10:13:15 9/12/01 EST
(0)
Value of Standard Value in Routing
-
Don
17:06:39 9/10/01 EST
(1)
Re: Value of Standard Value in Routing
-
Rich
10:52:34 9/19/01 EST
(0)
Outside process production
-
Debbie
13:11:19 9/10/01 EST
(2)
Re: Outside process production
-
G.H
07:30:21 9/11/01 EST
(1)
Re: Outside process production
-
Bondan
21:55:19 9/11/01 EST
(0)
Changing MRP profile: Is it retroactive for material created?
-
william cruz
23:38:22 9/09/01 EST
(3)
Re: Changing MRP profile: Is it retroactive for material created?
-
Bondan
00:02:02 9/10/01 EST
(2)
Re: Changing MRP profile: What is the background job name?
-
william
05:37:00 9/10/01 EST
(1)
Re: Changing MRP profile: What is the background job name?
-
Martin
08:27:47 9/10/01 EST
(0)
MO table
-
hen
21:18:19 9/09/01 EST
(0)
Dependent requirements not to be created
-
Reddy
05:21:15 9/09/01 EST
(3)
Re: Dependent requirements not to be created
-
Hans Bjelke
09:24:53 9/10/01 EST
(2)
Re: Dependent requirements not to be created
-
Reddy
06:42:41 9/14/01 EST
(1)
Re: Dependent requirements not to be created
-
Hans
10:28:36 9/17/01 EST
(0)
Confirmation: Hours from Production order not defaulting in CO11
-
MZ
19:12:25 9/07/01 EST
(3)
Re: Confirmation: Hours from Production order not defaulting in CO11
-
Naveed
05:46:06 9/08/01 EST
(2)
Re: Confirmation: Hours from Production order not defaulting in CO11
-
Suresh
01:51:41 9/10/01 EST
(0)
Re: Confirmation: Hours from Production order not defaulting in CO11
-
Suresh
01:51:29 9/10/01 EST
(0)
Error in Capacity Leveling
-
Ravishankar
13:08:56 9/07/01 EST
(3)
Re: Error in Capacity Leveling
-
Suresh
02:10:36 9/10/01 EST
(2)
Re: Error in Capacity Leveling
-
Ravi
21:58:26 9/10/01 EST
(1)
Re: Error in Capacity Leveling
-
Tick
10:13:31 9/13/01 EST
(0)
How to Delete Valuation Area?
-
william cruz
01:30:26 9/07/01 EST
(0)
Rework in Prod. Order Confirmation
-
Don
20:33:16 9/06/01 EST
(1)
Re: Rework in Prod. Order Confirmation
-
G.H
07:47:08 9/11/01 EST
(0)
"Fill" or "Copy" in Create Demand MD61
-
Robyn
17:35:14 9/06/01 EST
(1)
Re: "Fill" or "Copy" in Create Demand MD61
-
BJPO
08:53:53 9/19/01 EST
(0)
Backflushing of non available components
-
Claudio Damaceno
14:41:53 9/06/01 EST
(3)
Re: Backflushing of non available components
-
Tertius
08:01:18 9/17/01 EST
(0)
Re: Backflushing of non available components
-
Yimin
18:22:21 9/07/01 EST
(0)
Re: Backflushing of non available components
-
zubair
03:13:25 9/07/01 EST
(0)
Assembly order : Sales Order Update to Production Order.
-
Ram
08:53:17 9/06/01 EST
(2)
Re: Assembly order : Sales Order Update to Production Order.
-
peter
00:56:13 9/18/01 EST
(0)
Re: Assembly order : Sales Order Update to Production Order.
-
peter
00:39:41 9/18/01 EST
(0)
order reservation
-
knowles
06:14:38 9/06/01 EST
(1)
Re: order reservation
-
Shekhar
06:23:49 9/06/01 EST
(0)
BOM table
-
hen
04:14:36 9/06/01 EST
(1)
Try CS_BOM_EXPL_MAT_V2
-
Bram.
04:49:49 9/06/01 EST
(0)
transaction CM50
-
nuela
03:42:13 9/06/01 EST
(1)
Re: transaction CM50
-
Bram
05:46:27 9/06/01 EST
(0)
MRP type V1 and/or V2 (ASAP!)
-
nuela
03:33:01 9/06/01 EST
(1)
Re: MRP type V1 and/or V2 (ASAP!)
-
zubair
03:17:12 9/07/01 EST
(0)
Batch Determination in Backflushing (Repetitive Manufacturing)
-
Vicky Chen
21:44:48 9/05/01 EST
(0)
BATCH CREATION IN PRODUCTION ORDER
-
MARK RUCKER
14:32:26 9/05/01 EST
(1)
Re: BATCH CREATION IN PRODUCTION ORDER
-
shekhar
06:16:48 9/06/01 EST
(0)
URGENT: Problem in Demand Management!!!!
-
NC
13:27:25 9/05/01 EST
(0)
Alternative BOM
-
Harry
06:45:42 9/05/01 EST
(4)
Re: Alternative BOM
-
Naveed
06:55:40 9/05/01 EST
(3)
Re: Alternative BOM
-
Harry
21:18:42 9/05/01 EST
(2)
Re: Alternative BOM
-
Naveed
02:06:10 9/06/01 EST
(1)
Re: Alternative BOM
-
Naveed
02:41:50 9/06/01 EST
(0)
CM21- cannot see material text using WIN98
-
Shmulik
03:12:28 9/05/01 EST
(1)
Re: CM21- cannot see material text using WIN98
-
Steve
03:26:48 9/06/01 EST
(0)
Multiple BOMs & Phantom Assemblies.
-
Dev
01:42:00 9/05/01 EST
(2)
Urgent: Multiple BOMs & Phantom Assemblies. Pls help!
-
Dev
21:20:34 9/05/01 EST
(1)
Re: Urgent: Multiple BOMs & Phantom Assemblies. Pls help!
-
R Srinivasan
00:46:27 9/06/01 EST
(0)
SOP - Demand Mgt
-
PP
01:17:50 9/05/01 EST
(0)
PP-Repetitive: Goods receipt reversal with QM module, Help
-
Patrick Chen
22:53:09 9/04/01 EST
(0)
Old Phantom Assemblies Question - help!!!
-
Ed
10:22:07 9/04/01 EST
(3)
Re: Old Phantom Assemblies Question - help!!!
-
Joe
14:56:03 9/04/01 EST
(2)
Re: Old Phantom Assemblies Question - help!!!
-
Ed
14:09:38 9/06/01 EST
(1)
Re: Old Phantom Assemblies Question - help!!!
-
Joe
15:24:45 9/06/01 EST
(0)
Routing Component Allocation for Multi-Level BOMs.
-
Dev
07:23:01 9/04/01 EST
(3)
Re: Routing Component Allocation for Multi-Level BOMs.
-
Naveed
08:08:15 9/04/01 EST
(2)
Re: Routing Component Allocation for Multi-Level BOMs.
-
Dev
21:09:19 9/04/01 EST
(1)
Re: Routing Component Allocation for Multi-Level BOMs.
-
Naveed
02:02:53 9/05/01 EST
(0)
Material Costing Extract
-
Tim
06:17:21 9/04/01 EST
(0)
Production Order change do not allows time change
-
D.G.
04:29:40 9/04/01 EST
(3)
Use OPJM
-
Gilbert
10:30:08 9/04/01 EST
(0)
Re: Production Order change do not allows time change
-
Naveed
08:04:59 9/04/01 EST
(0)
Re: Production Order change do not allows time change
-
GH
06:26:01 9/04/01 EST
(0)
planning file entry.
-
alok gupta
03:46:38 9/04/01 EST
(3)
Re: planning file entry.
-
Adrien
16:54:28 9/04/01 EST
(0)
Re: planning file entry.
-
ppk
04:22:47 9/04/01 EST
(1)
Re: planning file entry.
-
alok
06:42:27 9/04/01 EST
(0)
planning file entry.
-
alok
03:33:34 9/04/01 EST
(1)
Re: planning file entry.
-
GH
06:23:23 9/04/01 EST
(0)
PP: Demand Mgmt. versions!
-
Abe
01:53:49 9/04/01 EST
(2)
Re: PP: Demand Mgmt. versions!
-
Ada
02:20:07 9/04/01 EST
(1)
Re: PP: Demand Mgmt. versions!
-
Abe
05:51:09 9/04/01 EST
(0)
System status : Engineering change Management
-
Bharat
00:27:04 9/04/01 EST
(0)
Patch 23--Very urgent, pls help!!
-
Stone Picker
22:44:34 9/03/01 EST
(1)
This issue is cancled, thanks!
-
Stone Picker
02:17:18 9/04/01 EST
(0)
Check BOMs before saving - Trans.CS02
-
Greg
06:44:09 9/03/01 EST
(0)
Engineering change Management : How to make warning message an error message
-
Bharat
05:27:37 9/03/01 EST
(0)
BOM usage
-
frits Jongepier
03:50:48 9/03/01 EST
(1)
Re: BOM usage
-
Mario
08:31:40 9/03/01 EST
(0)
Re-activating BOM's
-
Ada
03:13:16 9/03/01 EST
(0)
Urgent..! Capacity Levelling: Splits not getting dispatched in mass processing!
-
Sunil
02:25:12 9/02/01 EST
(0)
Requirement Generation in Kit Form: URGENT !!!!!!!!
-
Amol
00:49:32 9/02/01 EST
(4)
Re: Requirement Generation in Kit Form: URGENT !!!!!!!!
-
ppk
04:06:50 9/03/01 EST
(3)
Re: Requirement Generation in Kit Form: URGENT !!!!!!!!
-
Amol
04:53:08 9/03/01 EST
(2)
Re: Requirement Generation in Kit Form: URGENT !!!!!!!!
-
drr
22:12:56 9/03/01 EST
(1)
Re: Requirement Generation in Kit Form: URGENT !!!!!!!!
-
Amol
22:58:52 9/03/01 EST
(0)
Deleted records
-
T.Muralidharan
02:39:54 9/01/01 EST
(0)
Capacity Situation for PG members
-
Ram
01:17:26 9/01/01 EST
(1)
Re: Capacity Situation for PG members
-
Mario
09:16:46 9/03/01 EST
(0)
Can not create product group
-
kapadia
00:47:10 9/01/01 EST
(1)
Re: Can not create product group
-
Raja
01:13:23 9/03/01 EST
(0)
Sales Order BOMs
-
Dan
16:03:05 8/31/01 EST
(0)
Alternate Factory Calendars - How to Use With MRP???
-
Butch Godin
13:59:52 8/31/01 EST
(0)
Delivery Completed Indicator
-
Rajeev
13:20:29 8/31/01 EST
(1)
Re: Delivery Completed Indicator
-
Suresh
00:43:47 9/03/01 EST
(0)
SOP : How do I keep track of my last inactive / active version for item
-
kapadia
05:24:47 8/31/01 EST
(2)
Re: SOP : How do I keep track of my last inactive / active version for item
-
gilbert
06:59:59 8/31/01 EST
(1)
Re: SOP : How do I keep track of my last inactive / active version for item
-
kapadia
08:17:55 8/31/01 EST
(0)
MRP tpe M0 (MPS)
-
NF
18:28:38 8/30/01 EST
(3)
Re: MRP tpe M0 (MPS)
-
Gilbert
04:32:48 8/31/01 EST
(2)
Re: MRP tpe M0 (MPS)
-
NF
13:21:18 8/31/01 EST
(1)
Re: MRP tpe M0 (MPS)
-
Gilbert
03:20:20 9/04/01 EST
(0)
Is routing necessary for production order for subcontract item
-
kapadia
05:43:57 8/30/01 EST
(1)
Re: Is routing necessary for production order for subcontract item
-
Naveed
02:09:05 8/31/01 EST
(0)
Warning Messages
-
hen
03:59:02 8/30/01 EST
(1)
Re: Warning Messages
-
Naveed
01:05:13 8/31/01 EST
(0)
How can I create a product group?
-
George
01:25:40 8/30/01 EST
(5)
Re: How can I create a product group?
-
Ashish Mehta
00:45:47 8/31/01 EST
(1)
Thanks, your advice do help, it works
-
George
01:47:23 8/31/01 EST
(0)
Re: How can I create a product group?
-
Ashish Mehta
00:34:19 8/31/01 EST
(0)
Re: How can I create a product group?
-
Gilbert
07:35:08 8/30/01 EST
(1)
Re: How can I create a product group?
-
George
21:22:41 8/30/01 EST
(0)
How does MRP tackle phantom assembly with stock?
-
Stone Picker
21:17:27 8/29/01 EST
(1)
Re: How does MRP tackle phantom assembly with stock?
-
Hands-of-Stone
03:02:41 9/03/01 EST
(0)
ODA Connection to Shop Floor Systems
-
Tom VB
16:13:07 8/29/01 EST
(0)
Intercompany Production Planning and Forecasting
-
JDoyle
15:56:16 8/29/01 EST
(1)
Re: Intercompany Production Planning and Forecasting
-
Mario
08:42:47 9/03/01 EST
(0)
Production order cost calculation
-
Raju
13:59:59 8/29/01 EST
(2)
Re: Production order cost calculation
-
Martin
03:31:42 8/30/01 EST
(1)
Re: Production order cost calculation
-
Raj
04:24:57 8/30/01 EST
(0)
batch error when confirmation of prod.order
-
May
07:18:45 8/29/01 EST
(2)
Re: batch error when confirmation of prod.order
-
Raj
03:17:50 8/30/01 EST
(1)
Re: batch error when confirmation of prod.order
-
May
04:21:35 8/30/01 EST
(0)
Creating planned orders for components in spite of inventory/open PO’s possible?
-
Bram
05:59:39 8/29/01 EST
(3)
Re: Creating planned orders for components in spite of inventory/open PO’s possible?
-
Naveed
10:08:12 8/29/01 EST
(2)
Re: Creating planned orders for components in spite of inventory/open PO’s possible?
-
Bram
02:09:50 8/30/01 EST
(1)
Re: Creating planned orders for components in spite of inventory/open PO’s possible?
-
Naveed
07:53:23 8/30/01 EST
(0)
How to disply stantard price in BOM reporting function
-
bob
03:04:18 8/29/01 EST
(0)
user exit trigger during process order change
-
Ranga
02:44:03 8/29/01 EST
(0)
Variant Configuration; help again
-
Shyam
00:59:59 8/29/01 EST
(0)
Urgent: MRP Area: How to determine the issue storage location for stock trannsfer reservation?
-
SK
13:05:54 8/28/01 EST
(0)
Transfer of Forecast results to DM - using MD70 transaction
-
Ranga
09:22:13 8/28/01 EST
(2)
Re: Transfer of Forecast results to DM - using MD70 transaction
-
Rahul G
06:12:45 8/29/01 EST
(1)
Re: Transfer of Forecast results to DM - using MD70 transaction
-
Ranga
02:13:05 8/30/01 EST
(0)
How to define my own system status
-
Michael
09:03:02 8/28/01 EST
(1)
Re: How to define my own system status
-
ppblaster
00:57:02 8/29/01 EST
(0)
Capacity visible per PIR version number?
-
Bram
09:02:29 8/28/01 EST
(0)
Download BOM info into Excel
-
Steff
08:30:18 8/28/01 EST
(5)
Re: Download BOM info into Excel
-
peter
00:26:48 9/18/01 EST
(0)
Re: Download BOM info into Excel
-
Martin Traube
09:22:39 9/08/01 EST
(0)
Re: Download BOM info into Excel
-
ppk
01:19:58 8/29/01 EST
(2)
Re: Download BOM info into Excel
-
Steff
02:21:06 8/29/01 EST
(1)
Re: Download BOM info into Excel
-
Zajaczkowski Richard
10:34:20 9/07/01 EST
(0)
how to find out release date , print date ( status date in general ) for a production order
-
kapadia
06:20:22 8/28/01 EST
(3)
Re: how to find out release date , print date ( status date in general ) for a production order
-
Stone Picker
23:58:29 8/29/01 EST
(2)
Re: how to find out release date , print date ( status date in general ) for a production order
-
kapadia
03:28:34 8/30/01 EST
(1)
closed , thanks , I found how to do it
-
kapadia
03:51:39 8/30/01 EST
(0)
Engineering Change Management : Effectivity date : Can it be controlled by quantity?
-
kapadia
05:35:19 8/28/01 EST
(0)
Disable ATP check. ( Urgent )
-
Stone Picker
05:11:06 8/28/01 EST
(1)
This issue is cancled, thanks!
-
Stone Picker
06:12:32 8/28/01 EST
(0)
Capacity Levelling: Mass Processing-Splits not dispatched
-
Sunil
02:22:01 8/28/01 EST
(0)
Automatic GI & GR with the help of Naveed and others
-
Harry
01:37:36 8/28/01 EST
(5)
Re: Automatic GI & GR with the help of Naveed and others
-
Ashish Mehta
04:35:05 8/28/01 EST
(3)
Re: Automatic GI & GR with the help of Naveed and others
-
Harry
08:16:24 8/28/01 EST
(1)
Re: Automatic GI & GR with the help of Naveed and others
-
Ashish Mehta
00:51:21 8/29/01 EST
(0)
Re: Automatic GI & GR with the help of Naveed and others
-
Harry
08:00:38 8/28/01 EST
(0)
Re: Automatic GI & GR with the help of Naveed and others
-
Naveed
02:28:55 8/28/01 EST
(0)
Different Routing for same material in Assembly Order Processing
-
Jack
21:25:35 8/27/01 EST
(1)
Re: Different Routing for same material in Assembly Order Processing
-
Naveed
02:30:58 8/28/01 EST
(0)
Variant Configuration Help
-
Shyam
20:35:21 8/27/01 EST
(1)
Re: Variant Configuration Help
-
R Srinivasan
04:34:37 8/28/01 EST
(3)
Re: Automatic GI & GR with the help of Naveed and others
-
Harry
08:16:24 8/28/01 EST
(1)
Re: Automatic GI & GR with the help of Naveed and others
-
Ashish Mehta
00:51:21 8/29/01 EST
(0)
Re: Automatic GI & GR with the help of Naveed and others
-
Harry
08:00:38 8/28/01 EST
(0)
MRP Area (can this spread across the plants)
-
John Williams
18:24:41 8/27/01 EST
(1)
Re: MRP Area (can this spread across the plants)
-
Nancy
21:25:17 8/27/01 EST
(0)
Reducing Independent requirments
-
Armando
14:29:41 8/27/01 EST
(1)
Re: Reducing Independent requirments
-
noach
04:42:46 8/28/01 EST
(0)
Planning strategy 50
-
Iwan
10:57:14 8/27/01 EST
(2)
Re: Planning strategy 50
-
ppblaster
02:57:13 8/28/01 EST
(1)
Re: Planning strategy 50
-
PPbooster
05:54:45 8/28/01 EST
(0)
PP - MRP
-
Sathya
07:44:52 8/27/01 EST
(1)
Re: PP - MRP
-
Raja
01:35:56 9/03/01 EST
(0)
BOM in SC PR
-
knowles
04:55:15 8/27/01 EST
(5)
Re: BOM in SC PR
-
Naveed
15:02:25 8/27/01 EST
(4)
Re: BOM in SC PR
-
knowles
21:56:51 8/27/01 EST
(3)
Re: BOM in SC PR
-
ppblaster
02:56:21 8/28/01 EST
(1)
Re: BOM in SC PR
-
knowles
22:58:41 8/28/01 EST
(0)
Re: BOM in SC PR
-
Naveed
02:10:02 8/28/01 EST
(0)
Any reason why there are no backflushed???
-
Arthur
23:36:16 8/26/01 EST
(1)
Re: Any reason why there are no backflushed???
-
rouge
07:54:48 8/29/01 EST
(0)
Authorisation
-
Ajayan
21:34:46 8/26/01 EST
(8)
Re: Authorisation
-
Arthur
23:43:38 8/26/01 EST
(7)
Re: Authorisation
-
Ajayan
03:05:35 8/27/01 EST
(6)
Create a transaction variant
-
Arthur
05:52:08 8/27/01 EST
(5)
Re: Create a transaction variant
-
Ajayan
07:44:03 8/27/01 EST
(4)
You have to break them us into TWO DIFFERENT TRANSACTION CODE
-
Arthur
20:37:42 8/27/01 EST
(3)
Re: You have to break them us into TWO DIFFERENT TRANSACTION CODE
-
Ajayan
01:28:10 8/28/01 EST
(2)
YES, CREATE TRANSACTION VARIANT IS THE CORRECT ONE
-
Arthur
05:01:47 8/28/01 EST
(1)
Re: YES, CREATE TRANSACTION VARIANT IS THE CORRECT ONE
-
Ajayan
00:26:19 8/29/01 EST
(0)
SOP Documentation
-
saplocal
22:05:09 8/25/01 EST
(0)
Alternative Operations......
-
yogesh
06:59:11 8/25/01 EST
(2)
Re: Alternative Operations......
-
Suresh
01:55:29 8/28/01 EST
(1)
help....
-
yogesh
03:47:21 8/28/01 EST
(0)
SOP
-
PP
05:41:07 8/25/01 EST
(1)
Re: SOP
-
Steve
06:23:10 8/25/01 EST
(0)
PRT cost allocatioin in Routing
-
Jack
02:11:50 8/25/01 EST
(0)
auto creation of batch number
-
Mark Rucker
15:20:14 8/24/01 EST
(1)
Re: auto creation of batch number
-
Hisham
23:49:14 8/26/01 EST
(0)
mrp profile
-
3pon
12:56:05 8/24/01 EST
(1)
Re: mrp profile
-
Naveed
02:40:57 8/25/01 EST
(0)
Deleting task lists (PP_PLAN)
-
Louise Adams
12:41:05 8/24/01 EST
(0)
how to make control key as display only in routing
-
bharat
07:21:13 8/24/01 EST
(3)
SOLUTION is easy
-
Gilbert
10:14:00 8/24/01 EST
(0)
Re: how to make control key as display only in routing
-
Gilbert
09:39:28 8/24/01 EST
(1)
Re: how to make control key as display only in routing
-
Bharat
21:26:15 8/26/01 EST
(0)
Background Job for running MRP
-
saplocal
05:29:44 8/24/01 EST
(5)
Re: Background Job for running MRP
-
Suresh
06:42:19 8/24/01 EST
(4)
Re: Background Job for running MRP
-
saplocal
23:26:43 8/24/01 EST
(3)
Re: Background Job for running MRP
-
Suresh
01:44:48 8/28/01 EST
(2)
Re: Background Job for running MRP
-
saplocal
11:16:32 8/28/01 EST
(1)
Re: Background Job for running MRP
-
ALOK
06:29:52 9/08/01 EST
(0)
Switch off BOM explosion in planning run
-
Nancy
03:42:57 8/24/01 EST
(1)
Re: Switch off BOM explosion in planning run
-
Gilbert
04:08:15 8/24/01 EST
(0)
Work centre caterogy
-
hen
03:23:19 8/24/01 EST
(1)
Re: Work centre caterogy
-
Gilbert
04:15:01 8/24/01 EST
(0)
Routing on a Phantom
-
Jim Longworth
03:16:06 8/24/01 EST
(0)
BOM item categories
-
F. Jongepier
02:57:49 8/24/01 EST
(0)
Cross Plant Planning for Assembly order processing.
-
Jack
00:39:45 8/24/01 EST
(1)
Re: Cross Plant Planning for Assembly order processing.
-
Jack
00:49:41 8/24/01 EST
(0)
Automatic Goods Issue & Goods Reciept in PP Assembly To Order
-
Harry
00:25:37 8/24/01 EST
(4)
Re: Automatic Goods Issue & Goods Reciept in PP Assembly To Order
-
Naveed
02:48:39 8/24/01 EST
(3)
Re: Automatic GI & GR with the help of Naveed and others
-
Harry
02:09:20 8/25/01 EST
(2)
Re: Automatic GI & GR with the help of Naveed and others
-
Naveed
02:43:43 8/25/01 EST
(1)
Re: Automatic GI & GR with the help of Naveed and others
-
Harry
21:12:11 8/27/01 EST
(0)
MRP
-
DSF
18:48:08 8/23/01 EST
(1)
Re: MRP
-
Butch Godin
19:47:57 8/23/01 EST
(0)
How to make OVERLAPPING work in scheduling????
-
George
15:07:04 8/23/01 EST
(0)
trx Mc88-(change rough-cut planning) periods incorrect
-
bindi
06:45:27 8/23/01 EST
(0)
how to block all postings for settled production order
-
charles
05:26:11 8/23/01 EST
(12)
Re: how to block all postings for settled production order
-
Martin
07:10:14 8/23/01 EST
(11)
Re: how to block all postings for settled production order
-
charles
22:15:46 8/23/01 EST
(9)
Re: how to block all postings for settled production order
-
Martin
05:13:31 8/24/01 EST
(1)
Re: how to block all postings for settled production order
-
Martin
05:15:59 8/24/01 EST
(0)
Re: how to block all postings for settled production order
-
Martin
04:56:42 8/24/01 EST
(0)
Re: how to block all postings for settled production order
-
Martin
04:55:19 8/24/01 EST
(5)
Re: how to block all postings for settled production order
-
charles
07:35:26 8/24/01 EST
(4)
Re: how to block all postings for settled production order SUMMARY
-
Martin
05:28:15 8/25/01 EST
(3)
Re: how to block all postings for settled production order SUMMARY
-
charles
02:12:57 8/27/01 EST
(2)
Re: how to block all postings for settled production order SUMMARY
-
ppblaster
03:03:11 8/28/01 EST
(0)
Re: how to block all postings for settled production order SUMMARY
-
Martin
07:47:02 8/27/01 EST
(0)
Re: how to block all postings for settled production order
-
mukesh
07:16:51 8/23/01 EST
(0)
Fixed Lot Size
-
Suresh
03:40:39 8/23/01 EST
(0)
Production Orders : Storage Location Determination
-
Ram
03:29:34 8/23/01 EST
(4)
Re: Production Orders : Storage Location Determination
-
zubair
10:18:10 8/23/01 EST
(2)
Re: Production Orders : Storage Location Determination
-
while
22:43:37 8/26/01 EST
(0)
Re: Production Orders : Storage Location Determination
-
while
22:28:19 8/26/01 EST
(0)
Re: Production Orders : Storage Location Determination
-
Martin
07:12:58 8/23/01 EST
(0)
Rework quantity in order confirmation . Can it be dynamically added as next operation ?
-
Bharat
01:16:07 8/23/01 EST
(3)
Re: Rework quantity in order confirmation . Can it be dynamically added as next operation ?
-
gilbert frishert
10:13:49 8/23/01 EST
(2)
Re: Rework quantity in order confirmation . Can it be dynamically added as next operation ?
-
bharat
00:20:27 8/24/01 EST
(1)
Re: Rework quantity in order confirmation . Can it be dynamically added as next operation ?
-
Gilbert
04:12:02 8/24/01 EST
(0)
Inconsistency in classification data => transaction termin
-
Juli
21:05:11 8/22/01 EST
(0)
Planning time fence- Urgent
-
Srini
18:55:49 8/22/01 EST
(4)
Re: Planning time fence- Urgent
-
Suresh
07:15:12 8/23/01 EST
(3)
Re: Planning time fence- Urgent
-
Srini
21:18:32 8/23/01 EST
(2)
Re: Planning time fence- Urgent
-
Suresh
00:44:54 8/24/01 EST
(1)
Re: Planning time fence- Urgent
-
Srini
07:37:36 8/24/01 EST
(0)
PI sheet w/ RF technology
-
Yimin
11:24:54 8/22/01 EST
(0)
Confirmation by Bar Codes
-
Meena
09:29:38 8/22/01 EST
(1)
Re: Confirmation by Bar Codes
-
Gilbert
10:20:12 8/23/01 EST
(0)
SOP Info Strs S076
-
DSF
08:25:08 8/22/01 EST
(4)
Re: SOP Info Strs S076
-
Steve
13:34:36 8/22/01 EST
(2)
Re: SOP Info Strs S076
-
DSF
15:52:23 8/22/01 EST
(1)
Re: SOP Info Strs S076
-
Steve
15:50:12 8/23/01 EST
(0)
Re: SOP Info Strs S076
-
fm
10:44:12 8/22/01 EST
(0)
SAP PP Consultant vacancy
-
PG
05:56:15 8/22/01 EST
(2)
Re: SAP PP Consultant vacancy
-
Candidate
10:24:41 8/23/01 EST
(0)
Re: SAP PP Consultant vacancy
-
candidate NND
21:29:02 8/22/01 EST
(0)
Tracking Order
-
Yully
04:43:00 8/22/01 EST
(1)
Re: Tracking Order
-
zubair
10:23:39 8/23/01 EST
(0)
How to know a production order is settled or not
-
Charles
03:56:02 8/22/01 EST
(3)
Re: How to know a production order is settled or not
-
Martin
05:11:36 8/24/01 EST
(0)
Re: How to know a production order is settled or not
-
AKASH
07:45:17 8/22/01 EST
(1)
Yes : This is solution to my problem
-
charles
01:38:09 8/23/01 EST
(0)
Operand DAYS#1 in SOP macros
-
Ada
02:37:47 8/22/01 EST
(1)
Re: Operand DAYS#1 in SOP macros
-
Gilbert
10:27:18 8/23/01 EST
(0)
Operation sequence in production oder confirmation: How to handle part qty rework
-
bharat
23:51:47 8/21/01 EST
(2)
Re: Operation sequence in production oder confirmation: How to handle part qty rework
-
Ranga
10:16:47 8/22/01 EST
(1)
Thanks :It worked : Operation sequence in production oder confirmation:
-
Bharat
01:42:37 8/23/01 EST
(0)
Urgent: cannot create manual reservation upon P.O !
-
Grace
22:09:54 8/21/01 EST
(2)
Re: Urgent: cannot create manual reservation upon P.O !
-
Gilbert
11:03:35 8/23/01 EST
(0)
Re: Urgent: cannot create manual reservation upon P.O !
-
Gilbert
11:01:29 8/23/01 EST
(0)
Urgent: cannot create manual reservation upon P.O !
-
Grace
22:09:25 8/21/01 EST
(0)
Subcontracting - Planned Order
-
Mike
11:17:07 8/21/01 EST
(1)
Re: Subcontracting - Planned Order
-
Hisham
02:40:52 8/23/01 EST
(0)
THE "PRODUCTION LINE" OPTION IN MD07
-
CHARLIE
10:51:40 8/21/01 EST
(2)
Re: THE "PRODUCTION LINE" OPTION IN MD07
-
Suresh
00:56:06 8/24/01 EST
(1)
Re: THE "PRODUCTION LINE" OPTION IN MD07
-
Charlie
13:54:55 8/28/01 EST
(0)
MRP Documentation ( Urgent )
-
Jav
10:45:55 8/21/01 EST
(1)
Re: MRP Documentation ( Urgent )
-
Adrien
14:11:24 8/22/01 EST
(0)
BCO -> Input and Output of an material
-
Mike
08:22:34 8/21/01 EST
(0)
order status RESA
-
Kristof
08:12:31 8/21/01 EST
(1)
Re: order status RESA
-
Yimin
10:52:34 8/23/01 EST
(0)
Material return from customer : I use part component and scrap part
-
bharat
05:38:13 8/21/01 EST
(0)
Inconsistency for backward and forward scheduling result in routing..
-
Nancy
02:50:32 8/21/01 EST
(1)
Re: Inconsistency for backward and forward scheduling result in routing..
-
Ravi
04:34:15 8/21/01 EST
(0)
Business Ethics for the ERP Industry
-
CIBRES.COM
00:29:36 8/21/01 EST
(0)
PRODUCTION ORDER SETTLEMENT- urgent please
-
AKASH
22:03:37 8/20/01 EST
(4)
Re: PRODUCTION ORDER SETTLEMENT- urgent please
-
Martin
01:53:01 8/23/01 EST
(0)
Re: PRODUCTION ORDER SETTLEMENT- urgent please
-
Yimin
12:51:39 8/22/01 EST
(1)
Re: PRODUCTION ORDER SETTLEMENT- urgent please
-
Akash
22:14:53 8/22/01 EST
(0)
solution for your query
-
chrales
04:20:16 8/22/01 EST
(0)
Backflush - Old topic, New problem
-
Yimin
15:26:01 8/20/01 EST
(1)
Re: Backflush - Old topic, New problem
-
GP
02:59:39 8/26/01 EST
(0)
PP 261 GI to Cost Center
-
Suresh Rao
14:38:38 8/20/01 EST
(0)
Urgent! Where to set the firmed receipt & available stock for MRP?
-
saplocal
12:58:53 8/20/01 EST
(6)
Re: Urgent! Where to set the firmed receipt & available stock for MRP?
-
Harald Uebel
13:57:37 8/21/01 EST
(1)
I agree.
-
WM
22:52:19 8/21/01 EST
(0)
Re: Urgent! Where to set the firmed receipt & available stock for MRP?
-
Naveed
13:04:53 8/20/01 EST
(3)
Re: Urgent! Where to set the firmed receipt & available stock for MRP?
-
saplocal
13:38:21 8/20/01 EST
(2)
Re: Urgent! Where to set the firmed receipt & available stock for MRP?
-
while
22:26:06 8/20/01 EST
(1)
Re: Urgent! Where to set the firmed receipt & available stock for MRP?
-
Naveed
02:01:27 8/21/01 EST
(0)
Variant CONFIGURATION - Dependency CODES
-
Mat
11:47:17 8/20/01 EST
(2)
Re: Variant CONFIGURATION - Dependency CODES
-
Naveed
11:54:06 8/20/01 EST
(1)
Re: Variant CONFIGURATION - Dependency CODES
-
Mat
14:53:45 8/20/01 EST
(0)
In 3.1H, how can I post actual activities in Repetitive Mfg?
-
Lancer
06:26:53 8/20/01 EST
(0)
GR 101 without GI 261
-
knowles
05:17:06 8/20/01 EST
(4)
Re: GR 101 without GI 261
-
pp
03:07:29 8/21/01 EST
(1)
Re: GR 101 without GI 261
-
REDDY
05:49:54 8/21/01 EST
(0)
Re: GR 101 without GI 261
-
Naveed
13:07:16 8/20/01 EST
(1)
Re: GR 101 without GI 261
-
Naveed
09:22:33 8/21/01 EST
(0)
sop
-
pp
03:12:55 8/20/01 EST
(3)
Re: sop
-
Martin
03:25:28 8/20/01 EST
(2)
Re: sop
-
pp
04:04:28 8/20/01 EST
(1)
Re: sop
-
Steve
10:14:22 8/21/01 EST
(0)
Nettable Inventory in SAP
-
WM
23:33:15 8/19/01 EST
(0)
Hidden Characteristics
-
Mike
02:00:56 8/19/01 EST
(1)
Re: Hidden Characteristics
-
GP
03:22:05 8/24/01 EST
(0)
No availability check with Planning with Final Assembly
-
Marcus
11:57:26 8/17/01 EST
(2)
Re: No availability check with Planning with Final Assembly
-
Martin Traube
03:12:32 8/20/01 EST
(0)
Re: No availability check with Planning with Final Assembly
-
Steve
16:43:00 8/17/01 EST
(0)
Are there usefull function module to load Planned Independent Requirements (PIR)
-
Bram
03:09:21 8/17/01 EST
(1)
Re: Are there usefull function module to load Planned Independent Requirements (PIR)
-
Martin
05:17:44 8/20/01 EST
(0)
bom with std price
-
sree
00:53:36 8/17/01 EST
(4)
Re: bom with std price
-
SREE
00:55:48 8/17/01 EST
(3)
Re: bom with std price
-
Naveed
04:52:01 8/17/01 EST
(2)
Re: bom with std price
-
sree
02:53:00 8/19/01 EST
(1)
Re: bom with std price
-
Naveed
03:49:07 8/19/01 EST
(0)
BOM sub-items
-
Kamlesh
20:03:14 8/16/01 EST
(0)
Default tab in the second screen of Service Notification
-
Raj
11:24:40 8/16/01 EST
(0)
Default tab in display second screen ofService Notification
-
Raj
11:21:08 8/16/01 EST
(0)
Check data in transaction CS02 ( BOM ) - Realy Difficult
-
Greg
10:46:05 8/16/01 EST
(0)
REM-employee number
-
MF
10:20:41 8/16/01 EST
(0)
Subcontract scenario
-
AK
08:46:08 8/16/01 EST
(2)
Re: Subcontract scenario
-
Martin Traube
02:26:53 8/17/01 EST
(1)
Re: Subcontract scenario
-
Ranga
07:44:37 8/17/01 EST
(0)
Sub-contract scenario
-
AK
08:42:25 8/16/01 EST
(0)
Planorder profile / Procurement Proposals
-
Peter Schonewille
08:40:25 8/16/01 EST
(1)
Re: Planorder profile / Procurement Proposals
-
Steve
16:27:45 8/16/01 EST
(0)
MRP Termination
-
GP
07:41:13 8/16/01 EST
(1)
Re: MRP Termination
-
GP
08:34:58 8/16/01 EST
(0)
Stor Loc locking for use
-
Ram
03:04:10 8/16/01 EST
(0)
integration
-
srinivas
01:31:22 8/16/01 EST
(2)
Re: integration
-
Ken
04:25:17 8/16/01 EST
(1)
Thanks
-
srini
14:42:45 8/17/01 EST
(0)
BOM
-
John
00:25:27 8/16/01 EST
(2)
Re: BOM
-
Greg
10:23:27 8/16/01 EST
(1)
Re: BOM
-
Arthur
20:23:52 8/16/01 EST
(0)
Scrap rate
-
Jon
00:24:07 8/16/01 EST
(2)
Re: Scrap rate
-
Ram
10:50:24 8/20/01 EST
(0)
Re: Scrap rate
-
Yogesh Patankar
06:00:46 8/18/01 EST
(0)
PP-PI- PI sheet Format
-
Mohan
14:22:52 8/15/01 EST
(1)
Re: PP-PI- PI sheet Format
-
Martin Traube
02:08:53 8/17/01 EST
(0)
operation splits(URGENT)
-
shirish
10:59:12 8/15/01 EST
(0)
Revoking techincally completed order.
-
Venkat
03:40:37 8/15/01 EST
(1)
Re: Revoking techincally completed order.
-
Suresh
01:15:30 8/24/01 EST
(0)
Alternative sequence in capacity leveling
-
carol
23:48:02 8/14/01 EST
(0)
COGI: Disabling "save with errors" during confirmations with backflushing
-
JW
10:50:03 8/14/01 EST
(2)
Re: COGI: Disabling
-
PR
21:23:30 8/16/01 EST
(1)
Does not work
-
JW
17:47:44 8/17/01 EST
(0)
Variant in Sales Order. Need to make BOMs?
-
DO
10:45:44 8/14/01 EST
(0)
Can MRP run show planned ind requirement of for another plant
-
bharat
04:35:48 8/14/01 EST
(3)
Re: Can MRP run show planned ind requirement of for another plant
-
Ana M
10:21:18 8/14/01 EST
(2)
Re: Can MRP run show planned ind requirement of for another plant
-
Statler
13:33:40 8/14/01 EST
(1)
thanks it worked : Can MRP run show planned ind requirement ..........
-
bharat
05:25:50 8/16/01 EST
(0)
How to consider the stocks of other plants in MRP run
-
Purush
01:24:53 8/14/01 EST
(6)
Re: How to consider the stocks of other plants in MRP run
-
Steve
08:54:02 8/14/01 EST
(5)
Re: How to consider the stocks of other plants in MRP run
-
Purush
11:06:53 8/14/01 EST
(4)
Re: How to consider the stocks of other plants in MRP run
-
Steve
17:16:54 8/15/01 EST
(3)
Re: How to consider the stocks of other plants in MRP run
-
Nancy
05:29:36 8/16/01 EST
(2)
Thanks for the info...
-
Steve
16:50:02 8/17/01 EST
(1)
Thank you
-
Purush
07:46:16 8/24/01 EST
(0)
Sales order has no CO object
-
Ben
23:21:01 8/13/01 EST
(1)
Re: Sales order has no CO object
-
PR
21:28:49 8/16/01 EST
(0)
URGENT!!!!! PLEASE HELP WITH SCRAP IN ROUTING!!!!!!
-
Ana M
20:57:43 8/13/01 EST
(2)
Re: URGENT!!!!! PLEASE HELP WITH SCRAP IN ROUTING!!!!!!
-
Naveed
05:00:48 8/14/01 EST
(1)
Re: URGENT!!!!! PLEASE HELP WITH SCRAP IN ROUTING!!!!!!
-
Anam
09:36:16 8/23/01 EST
(0)
Test Papper
-
Mike
14:04:34 8/13/01 EST
(1)
Re: Test Papper
-
sreedhar
03:14:34 8/14/01 EST
(0)
PP_PI : Active Ingrediant
-
Zajaczkowski Richard
12:29:53 8/13/01 EST
(4)
Re: PP_PI : Active Ingrediant
-
Anand
22:00:37 8/13/01 EST
(3)
Re: PP_PI : Active Ingrediant
-
Martin Traube
03:39:07 8/14/01 EST
(2)
Re: PP_PI : Active Ingrediant
-
Zajaczkowski Richard
12:17:06 8/17/01 EST
(1)
Re: PP_PI : Active Ingrediant
-
martin
03:23:39 8/20/01 EST
(0)
Multiple value characteristic in object dependency
-
Shekhar
05:56:10 8/13/01 EST
(0)
Mass TECO
-
dhar
02:36:17 8/13/01 EST
(5)
Re: Mass TECO
-
Brad
16:48:45 8/14/01 EST
(1)
Re: Mass TECO
-
sree
02:24:53 8/20/01 EST
(0)
Re: Mass TECO
-
Anjali
04:55:14 8/13/01 EST
(2)
Re: Mass TECO
-
sreedhar
07:47:20 8/13/01 EST
(0)
Re: Mass TECO
-
sreedhar
07:46:20 8/13/01 EST
(0)
CRP: multiple commitments
-
Nancy L.
21:27:31 8/12/01 EST
(0)
Production Order-Short text
-
Chihi
03:28:51 8/12/01 EST
(1)
Re: Production Order-Short text
-
Steve
05:48:34 8/13/01 EST
(0)
Deletion of the production order containing CSER status
-
Tirthankar Bandyopadhyay
13:48:08 8/11/01 EST
(0)
PP-PI
-
Radhika Kapadia
11:05:37 8/11/01 EST
(0)
Minimum Req Quantity to trigger Replenishments
-
Mick...once more
09:19:52 8/11/01 EST
(2)
Re: Minimum Req Quantity to trigger Replenishments
-
Tirthankar Bandyopadhyay
14:06:09 8/11/01 EST
(1)
Re: Minimum Req Quantity to trigger Replenishments
-
Mick
02:59:16 8/12/01 EST
(0)
Operations in plastics shop
-
Pixy
17:26:24 8/10/01 EST
(2)
Re: Operations in plastics shop
-
ppk
23:00:28 8/17/01 EST
(0)
Re: Operations in plastics shop
-
Ram
10:28:01 8/11/01 EST
(0)
Using phantom just to consider stock quanitity for MRP
-
Dieter
13:24:33 8/10/01 EST
(2)
Re: Using phantom just to consider stock quanitity for MRP
-
CJ
11:00:16 8/13/01 EST
(0)
Re: Using phantom just to consider stock quanitity for MRP
-
Tirthankar Bandyopadhyay
13:59:04 8/11/01 EST
(0)
Component scrap in BOM
-
Gv
06:12:15 8/10/01 EST
(3)
Re: Component scrap in BOM
-
Ranga
07:18:37 8/10/01 EST
(2)
Component scrap in BOM
-
Rouge
07:34:32 8/10/01 EST
(1)
Re: Component scrap in BOM
-
Gv
20:56:11 8/10/01 EST
(0)
Urgent: create BOM
-
knowles
02:22:55 8/10/01 EST
(3)
Re: Urgent: create BOM
-
Zubair
07:49:17 8/10/01 EST
(2)
Re: Urgent: create BOM
-
Anjali Butley
01:57:43 8/13/01 EST
(1)
Re: Urgent: create BOM
-
Harald
14:13:48 8/21/01 EST
(0)
All VC champs - Help
-
NAS
02:12:09 8/10/01 EST
(6)
Re: All VC champs - Help
-
sobhanadri
15:53:49 8/15/01 EST
(0)
Re: All VC champs - Help
-
GP
03:27:45 8/11/01 EST
(0)
Re: All VC champs - Help
-
GP
03:27:04 8/11/01 EST
(3)
Re: All VC champs - Help Urgent
-
NAS
05:42:25 8/11/01 EST
(2)
Re: All VC champs - Help Urgent
-
GP
20:52:35 8/12/01 EST
(1)
Thanks - Help Urgent
-
NAS
02:10:15 8/13/01 EST
(0)
create BOM
-
knowles
01:40:53 8/10/01 EST
(0)
Material Provision Indicator in BOM - Batch Managed Component
-
Adrien
15:36:22 8/09/01 EST
(0)
COGI - Save in background
-
CJ
14:32:00 8/09/01 EST
(1)
Re: COGI - Save in background
-
Ian W
12:42:19 9/11/01 EST
(0)
PP - Making an assembly inactive
-
Imran Sadiq
13:46:47 8/09/01 EST
(2)
Re: PP - Making an assembly inactive
-
Naved
02:08:17 8/10/01 EST
(1)
Re: PP - Making an assembly inactive
-
Anjali Butley
05:16:58 8/13/01 EST
(0)
Quota arrangements and lead time differences
-
Mark C
12:32:44 8/09/01 EST
(1)
Re: Quota arrangements and lead time differences
-
Harald
14:19:38 8/21/01 EST
(0)
scrap doesn't reduce comp allocations on ensuing ops
-
kevin
11:35:38 8/09/01 EST
(0)
Challenging Problem: Period Split Lot Size Key!!!
-
George
06:28:22 8/09/01 EST
(4)
Re: THX Martin/AJ !!Challenging Problem: Period Split Lot Size Key!!!
-
George
09:29:53 8/15/01 EST
(0)
Re: Challenging Problem: Period Split Lot Size Key!!!
-
Martin Traube
03:47:12 8/14/01 EST
(1)
Re: Challenging Problem: Period Split Lot Size Key!!!
-
George
15:48:07 8/22/01 EST
(0)
Re: Challenging Problem: Period Split Lot Size Key!!!
-
Aj
07:02:28 8/12/01 EST
(0)
Capacity leveling
-
Bob
04:45:48 8/09/01 EST
(0)
Backorder processing for make-to-order scenario(CO06)
-
Nancy
02:06:02 8/09/01 EST
(1)
Re: Backorder processing for make-to-order scenario(CO06)
-
Martin Traube
07:42:14 8/10/01 EST
(0)
SalesPlanning & Demand Management
-
PP
00:48:52 8/09/01 EST
(0)
Sales order not showing in Stock/Requirements List
-
Don
17:29:43 8/08/01 EST
(3)
Re: Sales order not showing in Stock/Requirements List
-
Martin Traube
07:44:41 8/10/01 EST
(0)
Re: Sales order not showing in Stock/Requirements List
-
GP
00:35:53 8/09/01 EST
(1)
Re: Sales order not showing in Stock/Requirements List
-
rouge
06:23:59 8/09/01 EST
(0)
Material Provision Indicator in BOM
-
Adrien
15:07:29 8/08/01 EST
(2)
Re: Material Provision Indicator in BOM
-
rouge
08:22:22 8/09/01 EST
(1)
Re: Material Provision Indicator in BOM - Batch Managed Components
-
Adrien
15:31:45 8/09/01 EST
(0)
Planning Startegy 52 again
-
Don
13:14:57 8/08/01 EST
(6)
Re: Planning Startegy 52 again
-
Harald
14:37:10 8/21/01 EST
(0)
Re: Planning Startegy 52 again
-
Martin Traube
07:47:00 8/10/01 EST
(0)
Re: Planning Startegy 52 again
-
kevin
11:38:45 8/09/01 EST
(3)
Re: Planning Startegy 52 again
-
Don
19:44:54 8/09/01 EST
(2)
Re: Planning Startegy 52 again
-
while
02:22:51 8/13/01 EST
(0)
Re: Planning Startegy 52 again
-
while
02:21:12 8/13/01 EST
(0)
material consumption compare - demand management
-
lax
12:11:28 8/08/01 EST
(0)
Planning Startegy 52 again
-
Don
11:01:38 8/08/01 EST
(0)
Planning Startegy 52 again
-
Don
11:01:29 8/08/01 EST
(0)
Urgent!!!! Relationship between PP and HR
-
Carol
08:05:26 8/08/01 EST
(2)
Re: Urgent!!!! Relationship between PP and HR
-
PCH
14:35:02 8/08/01 EST
(1)
Re: Urgent!!!! Relationship between PP and HR
-
carol
21:38:20 8/09/01 EST
(0)
CM25 - Production Control
-
Mike
14:36:52 8/07/01 EST
(1)
Re: CM25 - Production Control
-
Hans Bjelke
10:02:28 8/08/01 EST
(0)
MC8L - Automatic proportions calculation for Products group
-
Nicolas Gryspeert
12:07:37 8/07/01 EST
(0)
HELP WANTED : TECHNICAL COMPLETION OF ORDER :
-
mike
09:41:45 8/07/01 EST
(1)
Re: HELP WANTED : TECHNICAL COMPLETION OF ORDER :
-
SGA
13:23:33 8/07/01 EST
(0)
bom print out in 3.1h
-
dhar
07:48:24 8/07/01 EST
(1)
Re: bom print out in 3.1h
-
PCH
14:36:58 8/08/01 EST
(0)
VC - Help
-
NAS
02:45:33 8/07/01 EST
(4)
Re: VC - Help
-
mike
06:38:54 8/07/01 EST
(1)
HELP WANTED : TECHNICAL COMPLETION OF ORDER :
-
:
06:40:10 8/07/01 EST
(0)
Re: VC - Help
-
Nancy
04:19:05 8/07/01 EST
(1)
Re: VC - Help
-
NAS
04:41:42 8/07/01 EST
(0)
Production Order-Read PP master Data.
-
Shmulik Adri
01:51:04 8/07/01 EST
(1)
Re: Production Order-Read PP master Data.
-
while
05:19:54 8/07/01 EST
(0)