Functional Location-Equipment


[ Follow Ups ] [ Post Followup ] [ Message Board ]

Posted by [IP Address: 200.254.198.130] 'Paulo' on September 21, 2001 at 10:05:47 EST:

When a maintenance order is created, if I type the equipment, the system brings the F.L. where the equipment is installed. As I have a structure where is possible install only one equipment for each F.L., I set this in “Single installation” in master data of F.L. Under this condition the users would like to type the F.L. in the maintenance order and the system brings the equipment installed.
If anyone know where to set up this situation please let me know.
We are currently on version 4.6b.
Thanks,



Follow Ups:



Post a Followup


Name:
E-Mail:
Subject:

Message:


[ Follow Ups ] [ Post Followup ] [ Message Board ]