Reservation (within PM) is possible with deleted material


[ Follow Ups ] [ Post Followup ] [ Message Board ]

Posted by [IP Address: 203.127.17.7] 'tingting' on September 18, 2001 at 02:45:48 EST:

Hi Sappers
I have a reservation that is generated automatically by the system when my user saves a Work Order (in Plant Maintenance Module) on 08/09/2001. However, the material that is being referenced by the Work Order was deleted entirely from the Material Master on 06/09/2001, which is a much earlier date than the transaction that has taken place. May I know whether this transaction is allowed to take place ? If not, how should I correct the error ? We are on 3.1H.

Thank you in advance
With Regards
tingting


Follow Ups:



Post a Followup


Name:
E-Mail:
Subject:

Message:


[ Follow Ups ] [ Post Followup ] [ Message Board ]