Re: dynamic modification skip status


[ Follow Ups ] [ Post Followup ] [ Message Board ]

Posted by [IP Address: 194.39.218.254] 'Memin' on September 13, 2001 at 07:11:17 EST:

In Reply to: dynamic modification skip status posted by [IP Address: 194.39.218.254] 'kum' on September 13, 2001 at 01:26:50 EST:

hi,

as far as i know, you can not configure the system so that it does not create the lot. i think it needs the lots for quality level tracing and follow up.

instead, you can use the automatic usage decision so that system checks the lots and gives the UD automatically. you define the period of this check by creting a job.

hope it helps.


: hi,

: I am able to control inspction lot samples through dynamic modification. But though the lot gets skip status based on the rule , still the materials are posted into inspection stock and lot is having status of skip.

: Can I make system not to create an inspection lot at all when skip condition is reached. If yes , where could I miss it?

: Help please..

: Kum




Follow Ups:



Post a Followup


Name:
E-Mail:
Subject:

Message:


[ Follow Ups ] [ Post Followup ] [ Message Board ]