Posted by [IP Address: 208.50.36.194] 'Sundararaman R' on September 19, 2001 at 15:19:27 EST:
We have B/w 20B system connected to 31H R/3 system. Upgrade process on R/3 from 31H to 46C is being carried out.
Although there is no updgrade at BW side, we have to disconnect from 31H and connect the system to 46C. We have a fair list of activities need to be done, but we have to ensure that we do not miss any activity while on this upgrade.
If anyone of BW Gurus has a list of activities on this sort of upgrade would be of great value to us.
Thanks for your help in advance.