by bharghav » Sun May 13, 2012 10:44 pm
Hi,
The system I am working on has got planning file entry(OMDO) configured along with the creation and scheduling of the total planning variant using MDBT.Is setting up of planning file entry a mandatory step before scheduling the total planning variant (MDBT).
As per my observation, change in stock automatically causes a change in the NETCH indicator.Need your insights!!!
Note: Using NETCH
Thanks, bharghav
-
bharghav
-
- Posts: 43
- Joined: Mon Jan 02, 2012 11:55 pm
- Location: India
by Ha Tran » Sun May 13, 2012 11:45 pm
Hi,
If you are going to run MD01 transaction with ''NETCH'' Processing Key, then it is necessary that the planning file entry job shall be run in background via OMDO transaction.
Cheers, HT
-
Ha Tran
-
- Posts: 27898
- Joined: Sun Mar 30, 2003 8:29 pm
- Location: Perth, Western Australia
-
by bharghav » Mon May 14, 2012 12:01 am
Hi,
As per your response I understand that, for executing MDBT transaction, you do not require to set up a planning file entry.I have got a question here.
In MDBT transaction while creating variant, I see the same screen which is reflecting in MD01. The only difference I see between these 2 transactions is that in MDBT,MRP run is scheduled as per the requirement however for MD01 we need to manually run it.If this is the case ,why do we need to set up the planning file entry (OMDO) for executing MD01. Kindly clarify.
Thanks, Bharghav
-
bharghav
-
- Posts: 43
- Joined: Mon Jan 02, 2012 11:55 pm
- Location: India
by Ha Tran » Mon May 14, 2012 4:48 am
Hi,
What I meant was that it is the ''Processing Key'' which is set in both MDBT or MD01 transaction which controls if you have to run OMDO transaction.
Cheers, HT
-
Ha Tran
-
- Posts: 27898
- Joined: Sun Mar 30, 2003 8:29 pm
- Location: Perth, Western Australia
-
by bharghav » Tue May 15, 2012 12:05 am
Hi,
I am still not clear.On change in stock,NETCH gets enabled in the planning file. Considering this case,why do we have to set up planning file in the config(OMDO).Need your inputs.
Tks, Bharghav
-
bharghav
-
- Posts: 43
- Joined: Mon Jan 02, 2012 11:55 pm
- Location: India
by Ha Tran » Tue May 15, 2012 3:15 am
Hi,
The fact is that not all new material master records that you define will have the stock quantity (load and/or change) before first MRP run. Hence, the planning file entry shall be generated.
Cheers, HT
-
Ha Tran
-
- Posts: 27898
- Joined: Sun Mar 30, 2003 8:29 pm
- Location: Perth, Western Australia
-
by bharghav » Fri May 18, 2012 10:06 pm
Hi,
I created a new material with absolutely no stock.In MD21 (display planning file entries), I see NETCH planning indicator set. Is it because of maintaining "Planning horizon" in the config.
If yes, then we do not have to set and schedule the planning file entry in the config.
Thanks, bharghav
-
bharghav
-
- Posts: 43
- Joined: Mon Jan 02, 2012 11:55 pm
- Location: India
by Sharpshooter » Tue May 22, 2012 1:42 pm
OSS note 205681 helps to explain this.
Good luck!
-
Sharpshooter
-