Hi All,
I have requirement that one inspection lot number can be used many times.
So when usage decision is made, the material need to be rework and then back to be check with the same inspection number because the user need the history of this inspection lot. So they need to know how many times the rework be done until all the material can be accepted.
Can this requirement be done in SAP? or do you have any other suggest to provide this thing?
Thanks a lot

