dear All
I have an issue
i have a MTS strategy for finish , halb, roh material
i want SAP to help me collect requiremnts of roh material , because for the same day i have many requirements
i read that we use (collective indicator = 2) only with MTO strategey
can i change the strategey of the ROH materials only to be MTO so i can use the collective indicator in MRP4 tap

Re: collecting requiremnts in MRP - MTS

PostPosted: Tue Apr 07, 2015 1:17 pm
by Sharpshooter
This is determined by the checking group (MARC-MTVFP). In the standard system, '01' provides summarised requirements, while '02' provides individual. Note that changing the material master will not change existing requirements!