I have the following case: in the first production step, we produce material 1 which is printed on 1 side on the machine.
After this, the material comes on stock for a limited time. The, it is switched and the second side is printed.

I am not sure what the best approach would be here: 2 different production orders or 1 production order with 2 operations or a collective order.

We work with basic SAP PP in ECC 6.0

Thanks for your feedback
sjelleman
 
Posts: 6
Joined: Thu Jun 08, 2006 6:28 am

Re: production order with multiple operations vs 2 prod. orders

Postby Ramarao » Wed Oct 08, 2014 4:57 pm

What is the duration of each step, and the waiting period? Is there any use of material after just the first step and not the second? If the second answer is NO, then preferable to keep it in one production order. There is no hard and fast way to decide though.
- Ramarao
Ramarao
 
Posts: 717
Joined: Wed Dec 11, 2002 7:16 pm
Location: Dallas, TX

Re: production order with multiple operations vs 2 prod. orders

Postby sjelleman » Thu Oct 09, 2014 1:09 am

There is no waiting time and the 'in-between' product will not be used for other purposes so I guess the best approach is to have 1 order with 2 operations as you are suggesting.
Thanks for the feedback!
sjelleman
 
Posts: 6
Joined: Thu Jun 08, 2006 6:28 am


Return to Logistics PP

Who is online

Users browsing this forum: No registered users and 6 guests





loading...


This website is not affiliated with, sponsored by, or approved by SAP AG.