This website is not affiliated with, sponsored by, or approved by SAP AG.

PP PDC vs POI interface

Logistics : PP

Moderators: Snowy, thx4allthefish, Ha Tran

PP PDC vs POI interface

Postby saprega » Mon May 13, 2013 9:04 pm

Hi,
Does any one know what the differences are between the PP PDC interface and POI (production optimization interface) interface. Both are used to interface with external manufacturing systems. Both have their own set of transactions (CI42,CI43, CI44, CI45 for PDC) and (POIT, POIM for POI). Also both have their own version of idocs (PPCC2RECORDER01 for production order in PDC and LOIPRO01 for production order in POI). They also use their own idocs for confirmations (PPCC2PRETTICKET and PPCC2PRETEVENT )in PDC for time tickets and time events in PDC) and CONF21 in POI.

What I am looking for is when is either of the interface used and are they used together ? Also what is the difference in the production order idocs and the onformation idocs for the two interfaces ?


Thanks
saprega
 
Posts: 276
Joined: Thu Jan 31, 2008 5:00 pm

Return to Logistics PP

Who is online

Users browsing this forum: No registered users and 8 guests





loading...


This website is not affiliated with, sponsored by, or approved by SAP AG.