I get a problem after I upgrade SAP PI 7.0 to SAP PI 7.11
my scenario JDBC -> sap pi -> sap bw in asynchronous mode.
Before upgrade to EHP1, JDBC adapter can achieve 10.000 recode without any problem. Either get data from data warehouse or send to destination (SAP BW).
The problem arise when EHP1 installed in production machine, connection between SAP BW disturbed. I only can get 1000 record from data warehouse and repeatedly hang up in inbound processing (SMQ2) before the message send to BW.
I was makes some tuning on abap stack, for http timeout in smicm to 1200 (default value is 600), the record successfully increase to 2000 but still I'm in a problem because too many data in data warehouse to be transferred to it destination. How can I get back the large amount of adapter call like the old one? please help..
note : I got HTTPIO_PLG_CANCELED in sxmb_moni when the message failed to process (>2000 records)
Thanks
Robby



