Changing UD date for an equipment inspection lot

Logistics QM

Moderators: Snowy, thx4allthefish, Ha Tran

Post Reply
aat99aat99
Posts: 18
Joined: Wed Mar 28, 2012 7:07 am

Changing UD date for an equipment inspection lot

Post by aat99aat99 » Wed Oct 07, 2015 9:07 am

Hi Folks

Wondered if any one know how you can change the usage decision date for a type 14 inspection lot. We have gauges that are calibrated off site, so the actual date when the calibration is done can be different to the date when we make the UD.

I've tried changing the dates of the inspection characteristics (inspector/date/etc) but although these can be changed, they don't transfer through to the UD date.

Also I've seen suggestions, that you can change the date via the inspection point but can't see how to do that and get it to update the UD date.

Any ideas ?

Cheers

Alistair

Post Reply