Sample procedure without inspection plan

Logistics QM

Moderators: Snowy, thx4allthefish, Ha Tran

Post Reply
MLU
Posts: 56
Joined: Mon Oct 21, 2002 3:50 am

Sample procedure without inspection plan

Post by MLU » Thu Mar 19, 2015 2:25 pm

Hi forum
I am investigating different possibilities regarding sampling.
I can see that there is a possibility to maintain a sampling procedure directly in the material master without having the material assigned to an inspection plan. The sampling procedure is with valuation type 501 Without Valuation parameters and a sampling scheme assigned.

I wonder what the business rationale would be for this possibility?

What I achieve is that at GR, a sample size is calculated in the inspection lot but the full GR quantity is posted on stock. The sample quantity don't have any impact at all except for information purpose.

I have the following assumption:
I can only have automatic stock reduction due to sampling if I run the full monty with inspection plan and a destructive MIC.
Is this assumption correct?

Br MLU

Post Reply