I've stumble onto something I've never seen before. We're recieving some agricultural product and for some reason the approved minimum size is < 35 mm until week 35 and then < 38 after that. They want to register the amont that is 'too small'.

To me it looks like I have to operate with two MIC's <35mm & <38mm ,but how to get them switching so that only one is relevant. DMR is a natural thought, but I can't see how to get it switching at the right time, especially since it's following the week number and not a speciffic date.

Re: Time dependent limit.

Posted: Tue Aug 12, 2014 2:29 pm
by DSamson
You could use the temporary tolerance change in QS22, as long as someone remembers to reset the dates each year (or write a little batch job to do it automatically at change of year).