This website is not affiliated with, sponsored by, or approved by SAP AG.

Different physical sample for each operation

Logistics QM

Moderators: thx4allthefish, Snowy, Ha Tran

Different physical sample for each operation

Postby kaushikRA » Wed Mar 28, 2012 6:19 am

Hi QM Gurus,

Is their any possibility of creation of different physical sample for each QM operation in the master receipe for 03 inspection type?
1) I have activated 03 inspection for the material
2) Master receipe consists of many operations let us say 5 operations and at operation 3 and operation 5 need to do QM inspection. Assigned QM operation for both the operation and created inspection plans by assigning sampling procedure with sample management and fixed sample size 1,sample drawing procedure,
3) When process order is created for inprocess material i'm getting the inpection lot with both the operations but with the same sample
EX: sample no. 2000201 for operation 30 and operation 40.
Here my scenario is need different physical samples for each operation EX: 2000201 for operation 3 and 2000202 for operation 5.

Regards,
Kaushik

kaushikRA
 
Posts: 1
Joined: Thu Mar 22, 2012 2:10 am

Re: Different physical sample for each operation

Postby ask » Wed Mar 28, 2012 2:29 pm

Please read SAP documentation..Needles to say, one read does not always help..

In this case, look at using "To partial sample" field in Sample drawing procedure and map t to inspection characteristics in the recipe.
Anand
ask
 
Posts: 760
Joined: Thu Dec 12, 2002 9:14 am
Location: California


Return to Logistics QM

Who is online

Users browsing this forum: No registered users and 5 guests




This website is not affiliated with, sponsored by, or approved by SAP AG.