Engineering Change management

Post by greeves » Thu Aug 06, 2009 2:58 pm

I'm trying to setup an ECM number, but when trying to set the Usage parameter it is grayed out on me and I'm not sure why. I've setup and maintained my profiles so I'm lost as to why when creating the number the usage (under that status information section) parameter is grayed out. Is that configurable?

Also, when I go into CS02 to make the change to the material bom and I supply the ECM number, the valid from date does not automatically get set to the validity date set within the ECM number that I've created. I've had this in the past but now it doesn't do this for some reason.

Any help is appreciated.

Regards,
Greg