Search found 88 matches

by vaditya10
Wed Jul 16, 2008 5:06 pm
Forum: Logistics PP
Topic: Urgent: Batch field in Planned Order?
Replies: 5
Views: 790

Re: Urgent: Batch field in Planned Order?

Hi Guys
In case u have access to your mail now, and remember the solution / steps for showing up the Batch No in Palnned Order. I will appreciate if you can share with me. As I need the functionality.
by vaditya10
Mon Jun 23, 2008 2:52 pm
Forum: Logistics PP
Topic: PLC interface design to upload GI in Rep
Replies: 4
Views: 676

Re: PLC interface design to upload GI in Rep

Thanks buddy
by vaditya10
Wed Jun 18, 2008 10:45 am
Forum: Logistics PP
Topic: Production Verison
Replies: 5
Views: 844

Re: Production Verison

U can create Production Version T code C223 and there u can provide the Routing and BOM combination for each version. Now when u create the Order, System will select primary version by default but then U can change it too. Also in material master u can sepcify how you want to explode the BOM, Giving...
by vaditya10
Wed Jun 18, 2008 10:41 am
Forum: Logistics PP
Topic: planned orders
Replies: 1
Views: 497

Re: planned orders

Could u be more detailed i.e what steps are u executing. When u run MRP and if there are demands exist. Then Planned order is generated
by vaditya10
Wed Jun 18, 2008 10:38 am
Forum: Logistics PP
Topic: BOM with zero quanity
Replies: 5
Views: 610

Re: BOM with zero quanity

You can think of using 'Alternative Material' process. This u can define in Bill of Material
by vaditya10
Wed Jun 18, 2008 10:22 am
Forum: Logistics PP
Topic: PLC interface design to upload GI in Rep
Replies: 4
Views: 676

Re: PLC interface design to upload GI in Rep

Thanks, As of now we do not have SAP XI we will be using BDC. This will work fine for Scheduled Jobs, but what about the requirement where PLC will interact directly with SAP and carry out Back flush ( we are using Repetetive) online so that GR, GI and Activity confirmation along with WIP lable prin...
by vaditya10
Tue Jun 17, 2008 12:53 pm
Forum: Logistics PP
Topic: PLC interface design to upload GI in Rep
Replies: 4
Views: 676

PLC interface design to upload GI in Rep

Hello Team Our client is using PLC's for recording charge qty of raw materials. It is expected that the PLC data with Materila No and Qty is being feed to SAP as Goods Issue on hourly or shift basis. We are implementing PP repetetive. Client also uses PLC for recording Part manufactured and expect t...
by vaditya10
Tue Apr 22, 2008 3:47 am
Forum: Logistics MM
Topic: Payment based on Qty sent
Replies: 1
Views: 199

Payment based on Qty sent

We have subcontracting process in which we send material x which being processed by vendor and returend as material Y. During the processing a fixed % of loss is allowed. i.e if we send 100Lb then we can receive back 95 Lb of the processed material. Our payment process is based on Qty shiped to vend...
by vaditya10
Wed Mar 19, 2008 3:53 pm
Forum: Logistics PP
Topic: PRT
Replies: 0
Views: 342

PRT

We are assigning PRT directly in Production Order. PRT is equipment type.

While assigning, the Field "Usage Value" is comming as blank, we want default it to "1" and unit as EA.

We can not assign PRT to Routing as PRT's are not Fixed they keep on changing
by vaditya10
Wed Mar 19, 2008 3:51 pm
Forum: Logistics PP
Topic: Unit conversion
Replies: 0
Views: 340

Unit conversion

I need to make the material to material transfer Mvt type 309, The one material is having unit EA and the receiving material is LB.

System doen not allow this transfer, How can we do it.
Alternative unit does not work
by vaditya10
Wed Mar 19, 2008 3:30 pm
Forum: Logistics PP
Topic: PRT Usage hours in through Production orders
Replies: 1
Views: 637

U mut have defined the Formula in PRT wihich calculates the Usage hrs
by vaditya10
Wed Mar 19, 2008 3:22 pm
Forum: Logistics PM
Topic: PRT Actual usage time
Replies: 4
Views: 1587

I know how to do in PP order 1. PRT must be equipment type . 2. PRT should have the Maint Plan, Task List, Measuring Point and Measuring Doc assigned with Counter as characteristc 3. There should be a Formula attached to PRT which will calculate the Counter reading. While assigning the PRT to Produc...
by vaditya10
Thu Mar 06, 2008 1:35 pm
Forum: Logistics PP
Topic: Creating and planning multiple material and small batches
Replies: 2
Views: 397

May be Batch split may work for you
by vaditya10
Thu Mar 06, 2008 1:34 pm
Forum: Logistics PP
Topic: ExpectYieldVar' have -1000 QTY
Replies: 4
Views: 926

Examine the confirmation (CO14) there is possibility that confirmation has been done for more then the production order quantity. ( qty includes yield, scrap and rework
by vaditya10
Thu Mar 06, 2008 1:31 pm
Forum: Logistics PP
Topic: VC - Material Variant BOM Not Generating In Production Order
Replies: 5
Views: 743

You may have to have the super BOM with object dependency for configuring the BOM