Search found 12 matches

by amalvaz
Sun Jun 13, 2010 11:59 pm
Forum: Logistics PS
Topic: Doc attachment
Replies: 3
Views: 3136

Doc attachment

hi

Is there any limitation to the file size when we attach document to a project through object services?

Regards
by amalvaz
Wed Mar 10, 2010 11:41 pm
Forum: Logistics PS
Topic: Balance of WBS XXXX is not zero
Replies: 2
Views: 2803

Balance of WBS XXXX is not zero

Hi All The Project is customer project with settlement to Profitability segment. The top WBS is billing WBS and only that has a RA key and settlement rule. I have performed RA and done the settlement. Closed all the subordinate WBS and activities. When I attempt to close the billing WBS(top WBS) the...
by amalvaz
Wed Jan 23, 2008 1:43 am
Forum: Logistics PS
Topic: Availability Tolerance
Replies: 1
Views: 599

Availability Tolerance

Hi

Where can I see the details of the activity group or transaction group that is used in defining tolerance limits in availability control?

Where are they defined in SAP?

Regards

Vaz
by amalvaz
Mon Jul 30, 2007 11:48 am
Forum: Logistics PS
Topic: Planned Cost for material assigned to Activity
Replies: 1
Views: 986

Hi

This is the SAP standard setting. If you set check the Network "Planning" in OPSC, then the (non-valuated) WBS reservation will also contribute to the planned value.

I am not sure how the cost will work in material execution.

Do a prototype and proceed if it is ok with the process.

Regards
by amalvaz
Mon Jul 30, 2007 11:35 am
Forum: Logistics PS
Topic: PS/SD lack of knowledge to invoice on PS or SD
Replies: 2
Views: 811

Hi

From your message I assume you have to convert the cost incurred in project to invoice to customer with pricing conditions.

You have to use RRB which is DP90, after doing the settings in RRB profile.

Regards
by amalvaz
Mon Jul 30, 2007 11:30 am
Forum: Logistics PS
Topic: Delivery through Project
Replies: 1
Views: 909

Hi

Use the option 2 , that is much easier and simple than assembly processing in project(option1).

Regards
by amalvaz
Fri Jun 15, 2007 11:19 am
Forum: Logistics PS
Topic: WBS user status
Replies: 2
Views: 868

Hi KDP
It would be different than the superior level WBS.
by amalvaz
Wed Jun 13, 2007 4:03 pm
Forum: Logistics PS
Topic: WBS user status
Replies: 2
Views: 868

WBS user status

Hi

The business requirement is that the user status of the lower level WBS element should be set based on the immediately above WBS element.

Can this be achieved through validation and substitution??

Any suggestions??

Thanks

Regards
Vaz
by amalvaz
Mon Jun 11, 2007 1:47 pm
Forum: Logistics PS
Topic: steps production - PS
Replies: 2
Views: 950

PS - Production

Hi 1. Create Standard project 2. Assign project to the material in network parameters from sales order table to create a project automatically 3. Create standard BOM and assign materials required to produce the FERT in standard network. 4. Also have the FERT assigned to one of the activities as "Ass...
by amalvaz
Thu Apr 13, 2006 8:44 am
Forum: Logistics PS
Topic: Planned OH costs calculated in ECP - Can we work around it?
Replies: 2
Views: 556

Hi

Check OPSB and OKKT for variants settings.

Regards
by amalvaz
Wed Mar 08, 2006 4:40 am
Forum: Logistics PS
Topic: Delivery from Project
Replies: 1
Views: 669

Delivery from Project

Hi The scenario is as below, 1. No Requirement transfer from sales order 2. Material in sales order will be used for project, hence by attaching the material of sales order into project structure, the requirement will be transferred to producing units of the same company. 3. No project stock, only p...
by amalvaz
Wed Mar 08, 2006 4:22 am
Forum: Logistics PS
Topic: Funds available, but unable to cut PO
Replies: 4
Views: 663

Tolerance

Hi

Please check what is the tolerance you have set in the availability control.

By increasing the tolerances you can "Cut" your PO.

Cheers
Vaz