Search found 106 matches

by PMBUG
Fri May 03, 2013 9:24 pm
Forum: Logistics PM
Topic: Long Text in Maintenance order When Print Can not
Replies: 1
Views: 716

Re: Long Text in Maintenance order When Print Can not

Check SAP script for printing order with programmer.
by PMBUG
Fri May 03, 2013 9:21 pm
Forum: Logistics PM
Topic: How to reused a Deleted Work Center?
Replies: 2
Views: 756

Re: How to reused a Deleted Work Center?

Once you un-delete workcenter, you can rename workcenters.
by PMBUG
Fri May 03, 2013 9:19 pm
Forum: Logistics PM
Topic: link of measuring point and maintenance plant
Replies: 2
Views: 815

Re: link of measuring point and maintenance plant

As Pete mentioned there is no one step report.

Here is alternate:
Select all equipment in IH08
From top menu, select "Measurement point".

-
by PMBUG
Fri Oct 12, 2012 4:00 pm
Forum: Logistics PM
Topic: Recording vessel inspection data in SAP
Replies: 2
Views: 903

Re: Recording vessel inspection data in SAP

As PJA suggested use QM module. Or we have used 'measurement points' in past. 1. Create measurement points on equipment with for each measurement type (e.g. Thickness). 2. Even you can create catalog code for meas points e.g. 'Inspection pass, fail, re-test pass etc. 2. Whenever inspection in perfor...
by PMBUG
Fri Oct 12, 2012 3:55 pm
Forum: Logistics PM
Topic: Forbid notificaiton creation for particular equipment
Replies: 6
Views: 3031

Re: Forbid notificaiton creation for particular equipment

You can try following
1. Create user status to prevent 'notification creation' (OIBS)
2. Set specific user status on equipment

Thanks-
by PMBUG
Thu Jun 21, 2012 10:34 pm
Forum: Logistics PM
Topic: Creating Maintenance plans & task lists
Replies: 4
Views: 1209

Re: Creating Maintenance plans & task lists

Here are major steps (if DMS is configured properly) 1. Create document via CV01N 2. Attach drawings in document 3. Open task list in edit mode 4. Goto operations tab, select operation for attaching drawing and click on PRT 5. Add 'Document' -> reference document number created in 1st step Once you ...
by PMBUG
Thu Jun 21, 2012 10:27 pm
Forum: Logistics PM
Topic: cost in test equipment management
Replies: 4
Views: 2195

Re: cost in test equipment management

I think you have two options 1. In KP26 add estimated activity cost as 0.01. This way, you will not get any warning while releasing workorder. If you don't post time against this workcenter, you will not incur cost anyway. 2. Enhance IW32 release function to ignore this message "Cost center assignme...
by PMBUG
Mon Jun 11, 2012 9:32 pm
Forum: Logistics PM
Topic: Is possible to replace the counter in maintenance Plan
Replies: 3
Views: 1377

Re: Is possible to replace the counter in maintenance Plan

In my experience it is not possible to change counter (measurement point) once maintenance plan is scheduled.

You will need to create new maint plan.

Thanks-
by PMBUG
Mon Jun 11, 2012 9:25 pm
Forum: Logistics MM
Topic: Transfer from Standing Work Order
Replies: 2
Views: 526

Re: Transfer from Standing Work Order

As HT suggested. You will need to perform following steps

1. Get parts into storage location via MIGO mvt type 262 - reference Stranding order
2. Issue part to PM order via MIGO mvt type 261

Not sure why want to manage parts via this process..

Hope this helps-
by PMBUG
Mon Jun 11, 2012 9:18 pm
Forum: Logistics PM
Topic: Serial Numbers in the Refurbishment Order
Replies: 3
Views: 2031

Re: Serial Numbers in the Refurbishment Order

Assumptions: a) You have equipment numbers created for material with serial number in system, if not you will create equipments in step 1. b) You have equipment installed under functional location i.e. Manufacturing line Here is my view on refurb process 1. Remove equipment for repair via Mvt type 2...
by PMBUG
Tue Apr 08, 2008 3:48 pm
Forum: Logistics PM
Topic: Mass loading of maintenance plan
Replies: 3
Views: 689

Re: Mass loading of maintenance plan

I have loaded many plans via LSMW, but I used recording to record IP42 and never had any problem. In some other master data load, I needed to press enter so Screen will accept value before moving forward (not an error message), so after starting LSMW job, I used to put pen on Enter key and press it ...
by PMBUG
Tue Apr 08, 2008 3:41 pm
Forum: Logistics PM
Topic: Part inter-changeability (Cross reference) with MPN
Replies: 0
Views: 677

Part inter-changeability (Cross reference) with MPN

Experts- Here we are trying to define all Spare part material master in SAP from legacy system. In legacy system we have part numbers are manufacturer’s part numbers. It also have option to interchange/merge/cross-reference parts and these parts are managed as part of main material master. Here I ...
by PMBUG
Tue Apr 08, 2008 3:40 pm
Forum: Logistics MM
Topic: Part inter-changeability (Cross reference) with MPN
Replies: 1
Views: 703

Part inter-changeability (Cross reference) with MPN

Experts- Here we are trying to define all Spare part material master in SAP from legacy system. In legacy system we have part numbers are manufacturer’s part numbers. It also have option to interchange/merge/cross-reference parts and these parts are managed as part of main material master. Here I ...
by PMBUG
Tue Mar 25, 2008 2:25 pm
Forum: Logistics PM
Topic: how to show which technician performed a job
Replies: 2
Views: 642

Re: how to show which technician performed a job

I believe you can search confirmation with personnel number in IW47 (or may be IW49).

Hope this helps-
by PMBUG
Tue Mar 25, 2008 2:18 pm
Forum: Logistics PM
Topic: maintenance calls
Replies: 1
Views: 527

Re: maintenance calls

what do you mean by 'Past call', do you mean that second order should not be generated if first call is still open.

...